SV-CL-03 „The rehabilitation and extension of water and wastewater networks in the localities of Suceava and Salcea”

LOT 2- „The extension of water and wastewater networks in the locality of Salcea”


Contractor: Joint Venture S.C. GROUP CONSTRUCT BUCOVINA S.R.L. (Leader) - S.C. AUTOPRIMA SERV S.R.L.


The value of the executed works: Lei 9,911,401.39 (VAT excluded)


Contract signing date: December 21st 2022


Duration of the contract: 24 months starting from the work commencement date, to be followed by a 60-month defect notification period.


Work commencement date: February 27th 2023


The investments carried out under the contract:

  •  water supply system:

- extension of water distribution networks by ca. 4.15 km, including the installation of water house connections linking all the households to the new pipelines as well as the construction of water chambers and the installation of underground fire hydrants;

- construction of a new water pumping station designed to increase the flow pressure in the Rezervorului st. area in Salcea;

  •  wastewater collection system:

- extension of the sewerage networks by ca. 5.1 km, including new sewerage house connections and sewerage chambers;

- construction of 4 new wastewater pumping stations, including the discharge pipes (1.4 km), in order to pump the wastewater flow into various sections of the sewerage networks where the geographic features of the ground prevent the downhill gravity flow of the collected wastewater. The location sites of these 4 stations are: Amurgului st., Popii st., Baladei II st. and Aurel Stanciu st.


Contract implementation status: the execution of works has been completed.