SV-CL-03 „The rehabilitation and extension of water and wastewater networks in the localities of Suceava and Salcea”
LOT 1 - „The rehabilitation and extension of water and wastewater networks in the locality of Suceava”
Contractor: Joint Venture GROUP CONSTRUCT BUCOVINA S.R.L. (Leader) - TOP SCAV S.R.L. - GEOMARCO CONSTRUCT S.R.L.
Contract price: LEI 60,583,601.00 (VAT excluded);
Contract signing date: July 17th 2024;
Duration of the contract: 29 months starting from the work commencement date, to be followed by a 60-month defect notification period;
Work commencement date: October 14th 2024
Works to be carried out under this contract:
- Water supply system:
- the rehabilitation of ca. 14 km of the water distribution networks;
- the extension of the water distribution networks by ca. 1.8 km; - Wastewater collection system:
- the rehabilitation of ca. 2 km of the sewerage networks;
- the extension of the sewerage networks by ca. 1.9 km;
- the construction of a new wastewater pumping station, including the discharge pipe;
Contract implementation status: contract is underway