SV-CL-04 „The construction of water and wastewater networks in the villages of Şcheia and Sfântu Ilie, Şcheia commune”

Contractor: Joint Venture CORDEP S.R.L. (Leader) - HYDROSTROY AD

Contract price: Lei 94,153,468.12 (VAT excluded)

Contract signing date: June 7th 2023

Duration of the contract: 36 months starting from the work commencement date, to be followed by a 60-month defect notification period

Work commencement date: September 4th 2023

Works to be carried out under this contract:

  •  water supply system:

- construction of new water distribution networks in the commune of Șcheia, specifically: ca. 26 km in Șcheia village and ca. 19 km in Sfântu Ilie village. These works also include new water house connections linking households to the new pipelines, as well as chambers and underground fire hydrants;

- construction of a water pumping station to increase the flow pressure in the distribution networks;

  •  wastewater collection system:

- construction of new sewerage networks in Șcheia commune, specifically: ca. 24.5 km in Șcheia village and 16.5 km in Sfântu Ilie village. These works also include sewerage house connections and sewerage chambers;

- construction of 17 wastewater pumping stations, including the discharge pipes (9 stations in Șcheia village and 8 in Sfântu Ilie village) in order to pump the wastewater flow into various sections of the sewerage networks where the geographic features of the ground prevent the downhill gravity flow of the collected wastewater.

Contract implementation status: contract is underway