SV-CL-05 „The rehabilitation and extension of water and wastewater networks in the locality of Fălticeni”

Contractor: Joint Venture S.C. CON BUCOVINA S.A (Leader) – S.C. TOP SCAV S.R.L. – S.C. SUMEC S.A.

Contract price: Lei 21,730,607.20 (VAT excluded)

Contract signing date: July 7th 2022

Duration of the contract: 34,5 months starting from the work commencement date, to be followed by a 60-month defect notification period.

Work commencement date: September 5th 2022

Works to be carried out under this contract:

  •  Water supply system:

- extension of the water distribution networks by a total length of ca. 3.4 km, including the construction of water house connections linking households to the new pipelines, the construction of water chambers as well as the installation of underground fire hydrants;

- rehabilitation of distribution networks through the construction of 7 pressure reduction chambers, 8 valve chambers and 6 flow and pressure measurement chambers in the existing distribution network;

  •  Wastewater collection system:

- extension of the sewerage pipelines by ca. 5 km, including new sewerage house connections and chambers;

- rehabilitation of ca. 1 km of existing sewerage pipes;

- building 6 new wastewater pumping stations, including the discharge pipes, which will pump the wastewater flow into various sections of the sewerage network where the geographic features of the ground prevent the downhill gravity flow of the collected wastewater.

Contract implementation status: contract is underway