SV-CL-11 „The construction of the Waste Water Treatment Plant in the locality of Vicovu de Sus”

Contractor: S.C. OCSA CONSTRUCȚII ȘI INFRASTRUCTURĂ S.R.L.

Contract price: Lei 24,659,782 (VAT excluded)

Contract signing date: September 21th 2022

Duration of the contract: 46.5 months from the work commencement date, to be followed by a 60-month defect notification period.

Work commencement date: October 20th 2022

The Waste Water Treatment plant to be built under the contract SV-CL-11 has been designed for a population equivalent of 18.476 P.E. and will collect wastewater from the sewerage networks in the agglomerations of Vicovu de Sus, Putna and Bivolărie. The WWTP will be equipped with the following advanced wastewater treatment facilities: a mechanical stage, a biological stage and a sludge processing stage. Also, the new WWTP will be equipped with a SCADA monitoring system.

Contract implementation status: contract is underway