SV-CL-14 „The construction of water and wastewater networks in the locality of Marginea and the extension of water and wastewater networks in the locality of Sucevița”

LOT 1 - „The construction of water and wastewater networks in the locality of Marginea”

Contractor: Joint Venture SUMEC S.A. (Leader) - CON BUCOVINA S.A. - LOIAL IMPEX S.R.L.

Contract price: Lei 107,535,141.23 (VAT excluded)

Contract signing date: December 29th 2023

Duration of the contract: 36 months starting from the work commencement date, to be followed by a 60-month defect notification period

Works commencement date:28.03.2024

Works to be carried out under this contract:

  •  Water supply system:

- construction of ca. 67,4 km of water distribution pipes, including house connections linking all the users to the new lines, water chambers and underground fire hydrants;

  •  Wastewater collection system:

- construction of ca. 60.4 km of sewerage pipes, including house connections to the new pipes and sewerage chambers;

- construction of 10 wastewater pumping stations, including the discharge pipes (ca. 5 km), needed to facilitate the pumping of wastewater into various sections of the sewerage network where the geographic features of the ground prevent downhill gravity flow.

Contract implementation status: contract is underway