SV-CL-15 „The rehabilitation and extension of water and wastewater networks in the locality of Siret”

Contractor: S.C. EUSKADI S.R.L.

Contract value on completion of works: Lei 41,779,149.43, VAT excluded

Contract signing date: January 31st 2022

Duration of the contract: 38 months starting from the work commencement date, to be followed by a 36-month defect notification period.

Work commencement date: March 21st 2022

Works to be carried out under this contract:

  •  Water supply system:

- rehabilitation of approx. 1 km of water distribution lines, including the installation of fully equipped house connections and underground fire hydrants;

– extension of water distribution lines by 19.7 km, including house connections to the new network, water chambers and underground fire hydrants;

- construction of 3 new water pumping stations in order to increase water pressure in the water supply networks;

  •  Wastewater collection system:

– extension of sewer pipes by ca. 16,3 km and connecting all the users to the new sewerage network;

- construction of 8 new pumping stations, including discharge pipes, needed to pump wastewater into various sections of the sewerage network where the geographic features of the ground prevent downhill gravity flow.

Contract implementation status: the execution of works has been completed.