SV-CL-16 „The extension of water and wastewater networks in the locality of Putna”
Contractor: Joint Venture S.C. SUMEC S.A. (Leader) – S.C. TOP SCAV S.R.L. – S.C. CON BUCOVINA S.A.
Contract price: Lei 25,584,709.16 (VAT excluded)
Contract signing date: June 24th 2022
Duration of the contract: 45 months and 29 days starting from the work commencement date, to be followed by a 48-month defect notification period.
Works commencement date: October 17th 2022
Works to be carried out under this contract:
- Water supply system:
- extension of water distribution networks in the locality of Putna (including Gura Putnei) by ca. 17.3 km in total, including the installation of house connections to the extended networks, water chambers and underground fire hydrants;
- construction of a new water pumping station (SPA 1) designed to increase water pressure in the Gura Putnei water supply network;
Wastewater collection system:
- extension of sewerage networks in the locality of Putna (including Gura Putnei) by 14.4 km in total, including the installation of house connections to the extended networks and sewerage chambers;
- construction of 3 new wastewater pumping stations, including discharge pipes, designed to pump wastewater into various sections of the sewerage network where the geographic features of the ground prevent downhill gravity flow.
Contract implementation status: contract is underway