SV-CL-18 „The construction of water and wastewater networks in the locality of Mitocu Dragomirnei”

Contractor: Joint Venture S.C. CON BUCOVINA S.A (Leader) - S.C. SUMEC S.A.

Contract price: Lei 35,054,719.78 (VAT excluded)

Contract signing date: April 15th 2022

Duration of the contract: 49 months starting from the work commencement date, to be followed by a
60-month defect notification period

Work commencement date: July 11th 2022

Works to be carried out under this contract:

  •  Water supply system:

- extension of the transmission main in Mitocu Dragomirnei by 5.4 km. Due to its location in the vicinity of the Suceava city, water will be supplied to Mitocu Dragomirnei inhabitants from the distribution networks of Suceava city;

- construction of the water management system in Mitocu Dragomirnei, which will include: 2 above ground water storage reservoirs, each with a storage capacity of 300 m3, a water chlorination unit and a water pumping station (SPA2) in order to maintain proper flow pressure in the distribution system;

- extension of the water distribution network by 17.8 km, including the installation of house connections to the new networks, water chambers and underground hydrants;

- construction of 2 booster water pumping stations;

  •  Wastewater collection system:

- extension of the sewer lines by ca. 18.5 km, including the installation of house connections to the extended network and sewerage chambers;

- construction of 4 new wastewater pumping stations, including discharge pipes, designed to pump wastewater into various sections of the sewerage network where the geographic features of the ground prevent downhill gravity flow.

Contract implementation status: contract is underway