SV-CL-21 „The construction of the Waste Water Treatment Plant in the locality of Dolhasca”
Contractor: Joint Venture Terra Dinamic S.R.L. (Leader), Terra Dinamic AG S.R.L. and D&D EUROCOM S.R.L.
Contract price: Lei 9,579,789 (VAT excluded)
Contract signing date: May 17th 2023
The contract execution period is 37.5 months from the date of commencement of the works, of which 6 months represent the design stage and 31.5 months represent the works execution stage, to be followed by a 60-month defects notification period
Design work commencement date: June 7th 2023
The WWTP to be built under the contract SV-CL-21 is designed for a population equivalent of 3,543 P.E. and will be equipped with the following advanced wastewater treatment facilities: a mechanical stage, a biological stage and a sludge processing stage. Also, the WWTP will be equipped with a SCADA monitoring system.
Contract implementation status: contract is underway